GSP-Project Ltd to design a facility with a daily capacity of 185 000 cubic meters of wastewater. The contract is part of ROTEC company's big project aimed at substantially increasing the wastewater, as well as improving the quality of wastewater treatted. This project is part of the federal target program "Protection of Lake Baikal and socio-economic development of the Baikal natural area for 2012-2020". As a result, Ulan-Ude will receive a modern, efficient and reliable wastewater treatment plant, which will positively affect the ecology in the region.