GSP-Project Ltd won an order for a batch of Sulzer high-speed turbocompressors HST for the Voronezh left-bank WWTP. The plant is owned by LLC LOS.
The order consists of 3 high-speed turbocompressors Sulzer HST40 with a capacity of 300 kW for each, which will be produced by Sulzer in Finland. This order is the result of a feasibility study, which our experts did in September 2016 to improve wastewater treatment energy performance.