The design of wastewater treatment plant reconstruction allows for replacement of basic technological equipment.
GSP-Project Ltd made the best offer and was chosen as equipment provider. The sides negotiated the contract for providing and installation of four Sulzer pumps XFP301M series to replace current equipment at the Main Sewage Pump Station.
Installation of Sulzer pump equipment will enable operation of the station with high efficiency factor, irrespective of irregularity of wastewater flows. For regulation of wastewater flow rate a variable frequency drive will be used. Using of the variable frequency drive guarantees reliable and energy efficient wastewater supply on WWTP. Sulzer pumps have long operating life and make operation with long period without maintenance possible . GSP-Project Ltd, as a main partner of Sulzer, gives 36-month-warranty for pumps’ operation.
Sulzer’s confidence in quality of their equipment lets them do offers, such unique for water treatment and wastewater market. Sulzer company has a regional service center in Yekaterinburg which is an important advantage because time for repair of equipment is remarkably reduced: service center is completed with all necessary equipment and warehouse of quick-wear parts.